0434 866 490/info@pumpdconcrete.com
Glass House Mountains/South East Queensland
Call Blake→
Talk to Blake0434 866 490
BAA QLD Pty Ltd ATF The Andreas Family Discretionary Trust, trading as PUMPD Concrete & Shotcrete
A Pumpd supervisor watching the crew place concrete on a waterfront site
High-pressure line pumping · South East Queensland

Concrete pumped
to the places a
truck cannot reach

Two John Winn WP60 line pumps, 40MPa+ mixes and runs past 100 metres. Around the house, through the garage, over the fence, down a batter.
02Concrete pumping
100m+
line runs · 40MPa+ mixes
· 20mm aggregate
Two WP60 line pumps40MPa+ mixes100m+ line runs20mm aggregateQBCC licensed concreter$20M public liability
What you are actually buying

Line pump,
not boom hire

100m+
Line runs, on ground a truck cannot get onto.
40MPa+
High-strength mixes, aggregate up to 20mm.
2
John Winn WP60 Spraymaster high-pressure pumps.

A boom needs room. The truck has to get close enough to swing an arm over the pour, and on a lot of blocks in South East Queensland it simply can’t. We run high-pressure line pumps instead. The pump sits wherever there’s space and the concrete travels the rest of the way through hose. If a job does need a boom, we can organise one through trusted partners.

That’s what makes the awkward ones possible: around the side of a house, through a garage, over a fence, down a batter, up a hill. Long runs are everyday work for us. Anything over 70 metres gets planned before the day, with a site check and the right crew and setup.

Booked direct with Blake and confirmed the afternoon before. Same standard whether it’s a house slab at Buderim or a culvert on a range job outside Gympie.

How a job runs↓
What we place

Four things we pump

Residential through to civil and industrial, on the same plant. If you can tell us the run, the fall and the mix, we can tell you whether it is a standard pour or one worth looking at first.

A commercial slab placed and finished by line pump
01
Slabs & footings
House slabs, footings, driveways, shed pads, blockfill and suspended slabs, placed clean and on time
Aerial view of a Pumpd pump working a tight residential block
02
Tight access & residential
Around the house, through the garage, over the fence. Pool surrounds and decorative or chute mixes included.
A Pumpd line pump placing concrete to a civil drainage structure
03
Civil & drainage
Culverts, headwalls and drainage structures on road works
Shotcrete sprayed to a batch-plant bund wall during a plant shutdown
04
Energy & industrial
Foundations, plinths and suspended elements on BESS and substation builds
Who we work under
PCA Ground Engineering Queensland Government Stanwell Yurika
Who books us

The crews we
turn up for

Repeat work makes up most of our pumping. Concreters come back because we turn up when we’re booked, builders because the slab goes in on program, and civil crews because we work inside their systems.

01Concreters & slab crewsSlabs, driveways and footings, with the pump confirmed the afternoon before
02Builders & developersSlabs, footings, blockfill and suspended slabs, poured on program
03Landscapers & pool buildersPool surrounds, decorative and chute mixes, tight back yards
04Civil contractorsCulverts, headwalls and drainage on range works, under your site systems
05Energy & industrialFoundations and plinths on BESS and substation builds
A Pumpd line pump truck set up and ready on a commercial site
How a job runs

From first call to finished job

Six steps, same every time, whether it’s a house slab or a culvert on a range road. Step through to see what happens and what we need from you.

01

The call

You ring 0434 866 490 and talk to Blake, not a call centre. Tell us the pour, the access and the date. Most of the time we can confirm on that call whether the block suits a line run and roughly where you sit in the week.

  • What we need: volume, the suburb, your date and who’s ordering the concrete.
  • Photos of the access and any plans help.
  • If the job needs a look first, we’ll say so rather than turn up and find out.
On the tools

Pumps, lines
and pours

Shot on site, not staged. Slabs, tight blocks and civil pours, all placed by PUMPD crews. More goes up on @pumpdconcrete

Before you book

Pumping
questions

Anything not answered here, call Blake on 0434 866 490 and ask him directly.

What is the difference between a line pump and a boom pump?+

A boom pump swings an arm over the pour, so the truck has to get close and needs room to set up. A line pump sits wherever there is space and sends the concrete through hose. That is what makes tight blocks, long runs and steep ground possible. If a job does need a boom, we can organise one through trusted partners.

How far can you pump?+

Past 100 metres, with aggregate up to 20mm and mixes to 40MPa and beyond. Anything over 70 metres is planned before the day, so tell us the run and the fall when you book.

Can you order the concrete for me?+

No. You or your supplier order the mix, we place it. That keeps you in control of the spec and the price, and it means we are not marking up someone else’s product.

How much notice do you need?+

The more the better in a busy week, but late bookings get done when the plant is free. Ring Blake and he will tell you where you sit in the program rather than string you along. Night and weekend pours by arrangement.

Do you clean up?+

Yes. Washout contained on site or bagged out, the road pressure-cleaned before we leave. You should not be able to tell which neighbour had the pump out the front.

How is pumping charged?+

Most residential pours are charged on our standard hire rates for the time on site, with a minimum hire. Commercial and civil pours are planned and priced before the day, including standby. Anything that changes on the day is recorded with a photo, signature and timestamp before we carry on.

What areas do you cover?+

Sunshine Coast, Moreton Bay, Brisbane and Gympie as our core area, regularly Gold Coast, Fraser Coast and Northern Rivers NSW, and away work for the right project across regional Queensland.